Legacy Rev A engineering visual set

Historical Aloom MW50 concept artwork retained for document traceability. These sheets are not the current electrical topology, OEM allocation or equipment basis.

Superseded by Screening Rev C · 2026-08-10 Do not use Rev A for design, procurement, connection studies or capacity claims. The current web appendix leaves POC voltage, OEM schedule, feeder topology, OLTC, redundancy and operating modes open.
Open current Rev C screening appendix Archive / Rev A master PDF Archive / E001 SLD Archive / M001 thermal P&ID
Superseded Rev A campus general arrangement
A001 — Campus GAHistorical 50 MW / 1 × 60 MVA concept image
REV A · NOT FOR CONSTRUCTION
Superseded Rev A transformer compound
E002 — Transformer compoundHistorical single-transformer concept image
REV A · NOT FOR CONSTRUCTION
Superseded Rev A NVIDIA reference hall
A010 — NVIDIA reference hallHistorical OEM illustration; not a current hall allocation
REV A · NOT FOR CONSTRUCTION
Superseded Rev A alternate NVIDIA reference hall
A010 alt — NVIDIA reference hallHistorical alternate illustration; not a current hall allocation
REV A · NOT FOR CONSTRUCTION